| Schematic Diagram |

Inspection 1. After disconnecting the vapor hose from the PCV valve, remove the PCV valve. 2. Reconnect the PCV valve to the vapor hose.
Replacement 1. Remove the condenser. 2. Remove the cap (A) on the bottom of the condenser with a L wrench. Tightening torque : 9.81 - 14.71 N.m (1.
Replacement 1. Disconnect the negative (-) battery terminal. 2. Remove the console upper front garnish. (Refer to Floor Console - "Floor Console Assembly") 3.