| Inspection |
| 1. |
Disconnect the negative (-) battery terminal.
|
| 2. |
Remove the crash pad lower panel (A).
(Refer to Body - "Crash Pad Lower Panel")
|
| 3. |
Remove the crash pad lower switch (A).
|
| 4. |
Disconnect the rheostat switch connector (A).
|
| 5. |
Operate the leveling switch, then check for continuity between terminals
of rheostat switch connector.
|
Inspection 1. Disconnect the negative (-) battery terminal. 2. Remove the crash pad lower panel (A). (Refer to Body - "Crash Pad Lower Panel") 3. Remove the crash pad lower switch (A).
Inspection Operating Logic Test (Manual only) Inspect the PTC operation by confirmation logic as follows; 1. Entering (1) Set the Floor mode and maximum heating position. (2) Turn off the blower switch.