| Removal and Installation |
| 1. |
Remove the engine cover (A).
|
| 2. |
Installation is reverse order of removal
|
Removal and Installation 1. Remove the engine room under cover (A). Tightening torque : 3.
Description The PTC (Positive Temperature Coefficient) heater is installed at the exit or the backside of heater core. The PTC heater is an electric heater using a PTC element as an auxiliary heating device that supplements deficiency of interior heat source in highly effective diesel engine.
System Block Diagram Component Parts And Function Outline Component part Function Vehicle-speed sensor, ESP/ABS Control Module Converts vehicle speed to pulse. ECM Receives signals from sensor and control switches.