| Inspection |
| 1. |
Connect the diagnostic tool on the Diagnosis Link Connector (DLC).
|
| 2. |
Start engine and check output voltages of APS 1 and 2 at C.T and W.O.T.
|
Circuit Diagram [M/T] [A/T] Harness Connector
Description Based on information from various sensors, the ECM can calculate the fuel amount to be injected. The fuel injector is a solenoid-operated valve and the fuel injection amount is controlled by length of injection time.
Inspection 1. Connect the battery voltage and check the blower motor rotation. 2. If the blower motor does not operate well, substitute with a known-good blower motor and check for proper operation.
Inspection 1. Measure the resistance between the terminals. 2. The measured resistance is not within specification, the blower resistor must be replaced. (After removing the resistor) Replacement 1.