| Inspection |
| 1. |
Turn ignition switch OFF.
|
| 2. |
Disconnect OCV connector.
|
| 3. |
Measure resistance between OCV terminals 1 and 2.
|
| 4. |
Check that the resistance is within the specification.
|
| Removal |
| 1. |
Turn the ignition switch OFF and disconnect the battery negative (-)
terminal.
|
| 2. |
Disconnect the CVVT oil control valve connector (A).
|
| 3. |
Remove the mounting bolt (B), and then remove the valve from the engine.
[Bank 1 / Intake]
[Bank 1 / Exhaust]
|
| Installation |
|
|
| 1. |
Install in the reverse order of removal.
|
Circuit Diagram [M/T] [A/T] Harness Connector
Description Variable Intake manifold Solenoid (VIS) valve is installed on the intake manifold. The VIS valve controls the vacuum modulator which activates a valve in the intake manifold.
Description and Operation Blcok Diagram • This system monitors the driving situations through the radar and the camera. Thus, for a situation out of the sensing range, the system may not normally operate.