| Circuit Diagram |







Components 1. Remote control switch (LH) 2. Trip switch (RH)
Inspection 1. Check for resistance between terminals in each switch position (LH). [LH : Audio + Hands free] Switch Connector terminal Resistance (±5%) SEEK Up 1 - 6 430Ω SEEK Down 1.
Removal 1. Disconnect the negative (-) battery terminal. 2. Remove the glove box. (Refer to Body - "Glove Box Housing") 3. Remove the smart key unit (A) after loosening the nuts.
Inspection Operating Logic Test (Manual only) Inspect the PTC operation by confirmation logic as follows; 1. Entering (1) Set the Floor mode and maximum heating position. (2) Turn off the blower switch.