| Component Location |

| 1. Front pillar trim |
Replacement • Put on gloves to prevent hand injuries.
Replacement • Put on gloves to prevent hand injuries.
Inspection Operating Logic Test (Manual only) Inspect the PTC operation by confirmation logic as follows; 1. Entering (1) Set the Floor mode and maximum heating position. (2) Turn off the blower switch.