Inspection 1. Disconnect the negative battery terminal. 2. Remove the roof trim assembly. (Refer to Body - "Roof Trim Assembly") 3.
Component Location 1. ICU Junction Block 2. Rear glass defogger switch (Manual type) 3. Rear glass defogger switch (Auto type) 4.
Inspection Operating Logic Test (Manual only) Inspect the PTC operation by confirmation logic as follows; 1. Entering (1) Set the Floor mode and maximum heating position. (2) Turn off the blower switch.
Component Location 1. Blower unit assembly Component Location 1. Intake seal 2. Intake upper case 3. Intake actuator 4. Intake door 5. Intake lower case 6. Blower pad 7.